Pipeline
Six programmes in development, at very different stages of maturity. For each one we publish the real state, the next milestone and the date of the last update. Where a programme moves slowly, that shows.
How to read this page
We do not use clinical trial phase nomenclature, which would be inappropriate for devices, software and cosmetic products. We use two distinct indicators.
Technological maturity (TRL 1–9 scale)
- TRL 1–2
- Basic principle observed; technology concept formulated.
- TRL 3–4
- Experimental proof of concept; component validation in the laboratory.
- TRL 5–6
- Validation and demonstration in a relevant environment.
- TRL 7–8
- Demonstration in an operational environment; complete and qualified system.
- TRL 9
- System proven in a real operational environment; product on the market.
Intellectual property status
Reported as discrete states — not started, in preparation, filed (with date), under examination, granted — because a filing is an event, not a percentage of progress.
Percentages
Where present, they indicate the internal completion of the work package named alongside. They do not indicate the distance from market entry.
Technological maturity
28%
- TRL 1
- TRL 2
- TRL 3
- TRL 4
- TRL 5
- TRL 6
- TRL 7
- TRL 8
- TRL 9
TRL level TRL 3
Programme entryTechnological maturity
61%
- TRL 1
- TRL 2
- TRL 3
- TRL 4
- TRL 5
- TRL 6
- TRL 7
- TRL 8
- TRL 9
TRL level TRL 6
Programme entryTechnological maturity
95%
- TRL 1
- TRL 2
- TRL 3
- TRL 4
- TRL 5
- TRL 6
- TRL 7
- TRL 8
- TRL 9
TRL level TRL 9
Programme entryTechnological maturity
50%
- TRL 1
- TRL 2
- TRL 3
- TRL 4
- TRL 5
- TRL 6
- TRL 7
- TRL 8
- TRL 9
TRL level TRL 5
Programme entryTechnological maturity
17%
- TRL 1
- TRL 2
- TRL 3
- TRL 4
- TRL 5
- TRL 6
- TRL 7
- TRL 8
- TRL 9
TRL level TRL 2
Programme entryTechnological maturity
15%
- TRL 1
- TRL 2
- TRL 3
- TRL 4
- TRL 5
- TRL 6
- TRL 7
- TRL 8
- TRL 9
TRL level TRL 2
Programme entryThe TRL 1–9 scale measures the technological maturity of a programme: the percentage marks its position along that scale, not its distance from market entry. Programme status updated August 2026.